Free Sample Exam

Questions: 50

Passing standard: 70.0%

Select an answer to get immediate feedback and an explanation. When you finish, submit the exam to see your diagnostic score and the categories that may need additional study.

Question 1 of 50

During a planned dye test, the marker is detected in a storm outfall much sooner than predicted by sanitary sewer travel time. Records indicate a nearby abandoned cross-connection. What is the strongest next investigation?

Report this question (opens in a new tab)

Question 2 of 50

A contractor proposes staging spoil piles and a bypass hose outside the mapped sewer easement to shorten the repair schedule. A property owner contests use of that area. What is the correct project-control response?

Report this question (opens in a new tab)

Question 3 of 50

A wet-well pump runs at the same fixed speed as before. Discharge pressure has increased while measured flow and motor current have declined. The suction level is normal. What hydraulic change best explains the trend?

Report this question (opens in a new tab)

Question 4 of 50

Verified monitors in two separate tributary basins show different storm responses. One rises within minutes of rain and quickly returns to baseline; the other stays elevated for days. Which interpretation best guides source investigation?

Report this question (opens in a new tab)

Question 5 of 50

A sewer has sound barrel walls but two verified leaking service connections. A CIPP rehabilitation is proposed. Which item must be included in the approved scope to address these identified leakage paths?

Report this question (opens in a new tab)

Question 6 of 50

Crews return to an open sewer repair excavation after heavy overnight rain. Soil has sloughed near one edge and water has collected in the trench. What is the safest next supervisory action?

Report this question (opens in a new tab)

Question 7 of 50

At a remote station, SCADA shows a constant normal level, but the independent high-level float has alarmed and the local sight reference confirms rising wastewater. Which operating action is defensible?

Report this question (opens in a new tab)

Question 8 of 50

SCADA sends a pump-start command and the PLC records receipt. No start occurs. The local selector is in OFF, and the PLC interlock log explicitly shows remote start disabled by that selector. What does the evidence establish?

Report this question (opens in a new tab)

Question 9 of 50

Two tributary flow meters total 1.5 MGD at a junction, yet the downstream meter reports 0.9 MGD under steady dry-weather conditions with no known diversion. Which QA step should precede an I&I conclusion?

Report this question (opens in a new tab)

Question 10 of 50

A sewer rehabilitation job shifts from work behind the sidewalk to a manhole inside an active travel lane. The crew proposes reusing yesterday’s pedestrian-only barricade layout. What should the supervisor require?

Report this question (opens in a new tab)

Question 11 of 50

A lift-station motor control center shows one cable termination consistently hotter than comparable terminations. Phase currents are balanced and within normal ranges. What maintenance finding should be prioritized?

Report this question (opens in a new tab)

Question 12 of 50

A dual-barrel inverted siphon remains open through several weeks of unusually low sewage flow. Deposits accumulate in both barrels even though CCTV finds no obstructions at the inlets. Which operational review most directly addresses the underlying condition?

Report this question (opens in a new tab)

Question 13 of 50

During a permit-required manhole entry, an entrant collapses and stops responding. The trained attendant is outside. The approved rescue plan provides a ready nonentry retrieval system already attached to the entrant; retrieval is unobstructed and does not create additional risk. What should the attendant do?

Report this question (opens in a new tab)

Question 14 of 50

An assessment report assigns severe cleaning priority to an isolated offset joint because grit is trapped there. A separate segment shows a broad longitudinal crack with soil visible through the opening. Which planning distinction matters?

Report this question (opens in a new tab)

Question 15 of 50

Upstream manhole depth increases whenever a downstream flood-control gate is partly closed. A nearby reach has recently been cleaned and inspected clear. What interpretation best directs the next hydraulic check?

Report this question (opens in a new tab)

Question 16 of 50

An automatic VFD alternates between its minimum and maximum output every minute. The level transmitter trace jumps between fixed extreme values while an independent staff gauge shows a stable wet-well level. What should be checked first?

Report this question (opens in a new tab)

Question 17 of 50

A planned excavation to replace a failed main crosses several closely spaced service laterals. The surface utility map does not distinguish abandoned from active connections. How should the repair staging change?

Report this question (opens in a new tab)

Question 18 of 50

A pipe-rehabilitation winch has begun winding cable unevenly on its drum, and the cable approaches the drum at a sharp lateral angle. Pull tension is nearing the work-plan limit. What is the most appropriate equipment action?

Report this question (opens in a new tab)

Question 19 of 50

Across a long, flat sewer during summer low flow, verified samples show increasing dissolved sulfide and decreasing oxidation-reduction potential. Which working interpretation best fits both observations?

Report this question (opens in a new tab)

Question 20 of 50

A four-gas instrument reads zero hydrogen sulfide in a sewer access structure. A certified bump test then shows a slow, low sensor response. The crew needs a defensible atmospheric assessment. What follows?

Report this question (opens in a new tab)

Question 21 of 50

Gauges at the same elevation indicate 48 psi (331 kPa) at a running pump discharge and 2 psi (13.8 kPa) at suction. Assume liquid specific gravity is 1.00, equal velocity heads, and negligible gauge-connection losses. Approximately what pump head is developed?

Report this question (opens in a new tab)

Question 22 of 50

A contractor delivers replacement pipe for a critical force-main section. The dimensions match the purchase order, but the submitted pressure class differs from the approved specification. How should acceptance proceed?

Report this question (opens in a new tab)

Question 23 of 50

Two CCTV crews log the same circumferential crack 38 ft apart on their stationing reports. One crawler encoder slipped during a grease-coated reach. Which record should guide excavation planning?

Report this question (opens in a new tab)

Question 24 of 50

A representative daily sample from an industrial interceptor contains chloride at 80 mg/L. Its independently metered average flow is 0.60 MGD (2.27 ML/day). What is the approximate daily chloride mass load?

Report this question (opens in a new tab)

Question 25 of 50

A pneumatic gate actuator receives the correct command but stalls halfway closed. Supply pressure at the actuator remains within its specified range during travel. Which comparison best separates actuator from gate problems?

Report this question (opens in a new tab)

Question 26 of 50

An interceptor has recurring corrosion and odor alarms only during evening production shifts at a nearby industry. A separate upstream residential reach has stable normal readings. Which sampling design most strongly tests the suspected source?

Report this question (opens in a new tab)

Question 27 of 50

A CSO equalization basin receives a steady 2.4 MGD (9.08 ML/day) during a 2-hour storm interval. Its controlled return flow is 1.2 MGD (4.54 ML/day). Assume no other outflow. How much volume accumulates?

Report this question (opens in a new tab)

Question 28 of 50

A combined sewer overflow retention basin is filling during a storm. Available treatment capacity has fallen, while the return pump continues to draw down the basin at its normal rate. What operating check best protects both the basin and downstream process?

Report this question (opens in a new tab)

Question 29 of 50

A repaired force main will be refilled after a long shutdown. Several high points contain automatic air-release valves, and the pump can accelerate rapidly. What restart approach best reduces avoidable transients?

Report this question (opens in a new tab)

Question 30 of 50

A duplex station starts its lag pump seconds after each lead-pump start. Verified level data show that the wet well remains below the approved lag-start elevation and no emergency override is active. Which review is most directly indicated?

Report this question (opens in a new tab)

Question 31 of 50

A sewer jetter operates smoothly with a full tank. As the tank level falls, discharge pressure begins to pulse and the pump produces a rattling sound. The nozzle spray was uniform at startup. What is the leading equipment check?

Report this question (opens in a new tab)

Question 32 of 50

A trunk main has a severe wall fracture beside a major road. Several residential laterals have lower-severity root intrusions. Which method provides the most defensible basis for comparing repair priorities?

Report this question (opens in a new tab)

Question 33 of 50

A metered collection basin carries 0.75 MGD (2.84 ML/day) on a representative dry-weather day. During the peak of a storm it carries 2.10 MGD (7.95 ML/day). Approximately what fraction of the total peak flow is the wet-weather excess above dry-weather baseline?

Report this question (opens in a new tab)

Question 34 of 50

Complaints rise near one downstream sewer manhole after a high-strength industrial discharge. The same location shows unusually low wastewater pH and elevated dissolved sulfide. Which investigation provides the strongest basis for corrective action?

Report this question (opens in a new tab)

Question 35 of 50

A portable wastewater bypass pump moves 600 gpm (37.9 L/s) against 65 ft (19.8 m) of total dynamic head at 65% pump efficiency. Assume liquid specific gravity is 1.00 and ignore motor losses. Approximately how much shaft power is required?

Report this question (opens in a new tab)

Question 36 of 50

An 18-in. trunk sewer has variable depths of flow and a suspected crown defect. A standard wheeled CCTV unit repeatedly loses sight of the crown when submerged. Which field approach best improves defensible assessment?

Report this question (opens in a new tab)

Question 37 of 50

A positive-displacement pump doses an odor-control chemical into a sewer force main. Its speed indication is stable, but repeated calibration-cylinder tests show erratic delivery and the discharge gauge pulses. What should be investigated first?

Report this question (opens in a new tab)

Question 38 of 50

A station has accelerated electrical-cabinet corrosion and intermittent sulfide alarms near an enclosed wet well. The exhaust fan runs but the air inlet is partly blocked. What should be reviewed first?

Report this question (opens in a new tab)

Question 39 of 50

An emergency generator has correct voltage and frequency at steady load. When a second large wastewater pump starts, frequency dips sharply before recovering, although fuel delivery remains stable. What evaluation best distinguishes inadequate transient response from a steady-load problem?

Report this question (opens in a new tab)

Question 40 of 50

A concrete manhole has severely softened crown surfaces above the flowline, but the invert appears intact. Sulfide odor and recurring dampness are documented. Which repair assessment is most appropriate?

Report this question (opens in a new tab)

Question 41 of 50

A force-main rupture releases wastewater onto a public street. The crew has isolated the break and responders are addressing access and containment. Which record provides the strongest basis for subsequent notifications and analysis?

Report this question (opens in a new tab)

Question 42 of 50

A centrifugal lift-station pump delivers 750 gpm (47.3 L/s) at 50 Hz. Assume similar operating points, unchanged impeller diameter, and negligible static head so the pump affinity relationship applies. What is approximate flow at 40 Hz?

Report this question (opens in a new tab)

Question 43 of 50

A force-main pressure sensor reads 18 psi high relative to a calibrated mechanical gauge at the same elevation, at both low and high flow. What conclusion is most consistent with these checks?

Report this question (opens in a new tab)

Question 44 of 50

A rehabilitated main passes a post-construction CCTV review. Six months later, recurrent dry-weather blockages develop near several lateral reinstatements. What evidence best directs the next field investigation?

Report this question (opens in a new tab)

Question 45 of 50

A vacuum truck hose separated during setup but caused no injury. The review identifies a missing restraint and an out-of-date setup checklist. What is the most useful corrective package?

Report this question (opens in a new tab)

Question 46 of 50

A temporary sewer bypass will cross a public road. The proposed pump location has a high suction lift and a discharge connection beside a catch basin. Which pre-start review best addresses the combined risks?

Report this question (opens in a new tab)

Question 47 of 50

A conventional full-bore magnetic flow meter on a temporary bypass line reports intermittent zero flow despite continuous discharge. It is installed at a high point where the pipe may not stay flooded. Which check is most diagnostic?

Report this question (opens in a new tab)

Question 48 of 50

After a pump stops, staff hear a sharp check-valve closure and briefly observe reverse motor shaft movement. Peak discharge pressure is elevated. Which assessment is most relevant?

Report this question (opens in a new tab)

Question 49 of 50

A reach repeatedly backs up in dry weather, and CCTV shows heavy deposits immediately downstream of a flattened joint. The upstream pipe diameter meets the current design review. Which action is most defensible?

Report this question (opens in a new tab)

Question 50 of 50

A city crew and a rehabilitation contractor will repair a remotely controlled lift-station discharge valve. The city has applied an equipment isolation lock, but contractor personnel have not joined the group energy-control procedure. What is required before they begin hands-on work?

Report this question (opens in a new tab)